Need help?

+9856-32825207 Hours: 6am-4pm PST M-Th;  6am-3pm PST Fri
SAFETY AND PRODUCTION

Project Design and Administration

The staff at SKT has experience in engineering, production and safety .

SOLUTIONS

SKT Services provides these tools by conducting efficiency studies of the mining cycle to focus not only on the loading and hauling cycles of a producing section, but also other operations necessary to the production cycle such as cutting, drilling and roof bolt operations.

PRODUCTION

Thermal and Coking Coal (Raw or Clean) and Iron Ore

Project Design and Administration

The staff at SKT has experience in engineering, production and safety.

PROJECTS

Block No.4 Parvadeh 4 and East Parvadeh (coking coal), Kamar-e-Mehdi (thermal coal)

TIME STUDIES

A complete analysis of all underground mining operations with recommendations for enhancing productivity in mind.

Mine Safety and Training

We focus on specialty and tailored training for special needs and situations.

wELCOME TO OUR COMPANY!

Saman Kavosh Tabas Co. (SKT) is mining subsidiary of Saman Faraz Gheshm Co (SFG) Holdings, the main major of this company is extraction of thermal and coking coal from coal field regions in Kamar-e-Mehdi and Parvadeh respectively. This company is the main contractor of IMIDRO (Iranian Mines & Mining Industries Development & Renovation) and IMPASCO (Iran Minerals Production and Supply Company) in Block No.4 Parvadeh 4 and East Parvadeh (coking coal kind), respectively. The annual production of each of these mines are 600,000 tons separately, it means 1,2 Million tons raw coal that can provide 700,000 tons clean coal after the washing of them in 300 tons/hour capacity coal washing plant. Block No.4 Parvadeh 4 was opened by 3 inclined shafts and the whole mine was divided to east and west parts. Choosing of the semi mechanized method with production of 100,000 tons in east part was based on the more complicated situation (higher dip in coal seam). The west part of this mine has the best situation for using fully mechanized by production capacity of 500,000 tons in a year. In this mine the proved reserve is about 10 million tons in 2 different seams of C1 and B2.

East Parvadeh have the same condition as Block No.4 and will be opened by 3 inclined shafts and will be divided to east and west part. In this mine both side will have 2 active semi mechanized longwall panel to provide 600,000 tons raw coal production. In East Parvade the thickness of coal seam is lower than Block No.4 and using fully mechanized will increase the dilution. In this mine the proved reserve is about 50 million tons in 2 different seams of C1 and B2. Kamar-e-Mahdi coal field have 450 million tons thermal coal deposit. Production in this mine will be increased to 1.2 million tons per year in the next development plan. We totally ready to answer your demands in the various range of coal specifications.

SAFETY,
PRODUCTION, GROW & SUCCEED

The main major of SKT is production of thermal and coking coal in the coal field of Tabas (South-Khorasan province, Iran). In this field, SKT Co. is one of the largest companies in Middle East by having more than 500 milion tons of coal reserve.

read more

The Related Companies